Disassembly & assembly the blades for 7A Ha Do wind farm

7A Ha Do Wind farm Project scale: 50MW
22/110Kv substation: 01x63MVA
110Kv line: Connected from 22/110kV lifting substation to 110kV busbar at Ninh Phuoc 220kV substation. Double circuit line, ACSR-300mm2 conductor, length 12Km, hanging in front of 01 circuit
Technical parameters
Number of turbine towers: 12
Height of wind tower: 130.3m
Turbine diameter: 138.8m
Rated capacity: 4200kW
Estimated annual output:
P50% = 184.313 million kWh/year
P75% = 172.254 million kWh/year
P90% = 161.401 million kWh/year
Power factor: 41.7%

Location: Phuoc Minh commune, Thuan Nam district, Ninh Thuan Province.

Clients: ENERCON Vietnam Company Limited

Wind turbine OEM: Enercon E138 EP3 E3.

Scope of supply: Disassemble and Installation.

Main equipment:

Crawler crane Sany SCC8000A – 800 tons

Crawler crane 100 ton & Mobile crane 80 ton

Duration: 15th Dec 2023 to 15th Jan 2024