+84972 521 693, +84988 82 3355
With many years of experience in the field of Heavy Lifting & Services, PLC always strives to become a supplier of top quality in Vietnam and in the region. In order for our customers to rest assured to cooperate, we are constantly improving and developing more every day.
Location: Huong Phung commune, Huong Hoa district, Quang Tri Province. Clients: ENERCON Vietnam Company Limited Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Disassemble and Installation. Main equipment: Crawler crane 800T Zoomlion ZCC9800W, Crawler crane 80 ton Mobile crane 70 ton Duration: Feb-2024 to Mar-2024
Location: Phuoc Minh commune, Thuan Nam district, Ninh Thuan Province. Clients: ENERCON Vietnam Company Limited Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Disassemble and Installation. Main equipment: Crawler crane Sany SCC8000A – 800 tons Crawler crane 100 ton Mobile crane 80 ton Duration: 15th Dec 2023 to 15th Jan 2024
Moving 9 container cranes from vessel to yard (RTG crane). Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Long An International Port. Number of cranes: 9 RTG cranes. Crane type: RTG (Rubber Tired Gantry Crane) used at container yard. Our Scope: Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to...
Moving 4 units STS cranes from vessel to quay. Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Phuoc An International Port. Number of cranes: 4 STS crane Crane type: STS crane. Our Scope: Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to the port. Operate the ballast pump and winch to...
Location: Huong Phung commune, Huong Hoa district, Quang Tri Province. Clients: ENERCON Vietnam Company Limited Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Disassemble and Installation. Main equipment: Crawler crane 800T Sany SCC8000A Crawler crane 80 ton Mobile crane 70 ton Duration: Sep-2024 to Oct-2024
Moving 8 RTG crane container cranes from vessel to yard (RTG crane). Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Hai Phong International Port. Number of cranes: 8 RTG cranes. Crane type: RTG (Rubber Tired Gantry Crane) used at container yard. Our Scope: Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship...
Moving 3 units STS crane container cranes from vessel to yard. Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Hai Phong International Port. Number of cranes: 3 STS cranes. Crane type: STS crane container. Our Scope: Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to the port. Operate the ballast pump...
Moving 9 units RTG cranes from vessel to yard. Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Phuoc An International Port. Number of cranes: 9 RTG cranes Our Scope: Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to the port. Operate the ballast pump and winch to move the cranes from the...
Moving 24 container cranes from vessel to yard (RTG crane). Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Long An International Port. Number of cranes: 24 RTG cranes. Crane type: RTG (Rubber Tired Gantry Crane) used at container yard. Our Scope: Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to...
Location: Long An international port, Long An Province Clients: Infinity Logistic Wind turbine OEM: Windey WD4500 4.5Mw Number of WTG: 07 Scope of supply: Unloading, loading in yard port and to barges transport. Main equipment: 500T Crawler crane Sumitomo CT10000 x 1 unit 250T Crawler crane Kobelco x 1 units 100T & 150T crawler crane x 2 unit 70T mobile crane x 2 unit Team...
Moving 3 container cranes from barge to quay (RTG crane) Crane manufacturer: Mitsui E&S (MES E&S) Customers using cranes: Long An International Port Number of cranes: 03 cranes Crane type: STS use at quay Our Scope: Remove the lashing and reinforcement system of the ship’s crane; Move 03 STS cranes from ship to shore; Connecting, completing and commissioning 03 RTG cranes; Load test and hand...
Location: Huong Linh commune, Huong Hoa district, Quang Tri Province. Clients: Huong Linh 4 Wind Power JSC. Wind turbine OEM: Envision EN3.3MW-141. Number of WTG: 10. Scope of supply: Transport, Cranage & Installation. Main equipment: Man tractor head x 2 units. Shangdong adapter x 2 sets. Demag CC2800-1 x 2 units. IHI CCH2000-5 x 1 unit. Watch the video of the operation here!
The Quang Trach 1 is a 1.2GW coal-fired power plant under construction in the Quang Bình province of Vietnam. Vietnam’s state-owned power utility Vietnam Electricity (EVN) is developing the project with an estimated investment of £1.26bn ($1.78bn). PetroVietnam was the previous developer, which broke ground on the project in July 2011 with commissioning scheduled in 2015. The Government of Vietnam, however, assigned the project to...
PLC uses 800T mobile crane and 120T auxiliary crane with a team of engineers and experienced workers to safely dismantle container cranes with a dismantling height over 60m, requiring high safety, along with the manufacturer’s experts from Mitsui E&S. Location: Tan Cang Hai Phong International Container Terminal (TC-HICT). Don Luong Area, Cat Hai Town, Cat Hai District, Hai Phong City, Vietnam. Scope of work: Heavy...
Moving 3 container cranes from barge to quay (RTG crane) Crane manufacturer: Mitsui E&S (MES E&S) Customers using cranes: Long An International Port Number of cranes: 03 cranes Crane type: STS use at quay Our Scope: Remove the lashing and reinforcement system of the ship’s crane; Move 03 STS cranes from ship to shore; Connecting, completing and commissioning 03 RTG cranes; Load test and hand...
Moving 9 container cranes from vessel to yard (RTG crane) Crane manufacturer: Mitsui E&S (MES E&S) Customers using cranes: Nam Dinh Vu Port Number of cranes: 9 cranes Crane type: RTG (Rubber Tired Gantry Crane) used at container yard Our Scope: Remove the lashing and reinforcement system of the ship’s crane; Move 9 RTG cranes from ship to shore; Connecting, completing and commissioning 9 RTG...
The Vien An wind power plant will have a capacity of 50 MW, which is an investment project of the Vien An Energy One Member Limited Liability Company, with capital of around VND 2,411 bn, to be built in the Ngoc Hien District of Ca Mau Region with 16 WTG x MySE3.2-156. The project information is as follows: Investor: Vien An Energy Company Limited Turbine OEM:...
Location: Thoi Thuan, Binh Dai dist, Ben Tre Province, Viet Nam Scope of work: Piling works PHC D800/60-70m (from March/2021 to May/2021) total: 15,000md Used the equipments: 1. Barge/crane: 3600 tons (71×18.5m)/200 ton, diesel hammer 10 ton… 2. Barge/crane: 9000 tons(100×27.5m)/250 ton, diesel hammer 10 ton… 3. Barge/crane: 1800 tons(52x16m)/150 ton, diesel hammer 10 ton… 4. Barge/crane: 3500 tons(63x20m)/250 ton, diesel hammer 10 ton… 5. Barge/crane:...
Location: Long An international port, Long An Province Clients: Infinity Logistic Wind turbine OEM: Envision 3.3MW-141 Number of WTG: 22 Scope of supply: Unloading, transport, loading to barges transport. Main equipment: 500T Crawler crane Sumitomo CT10000 x 1 unit 300T Crawler crane IHI DCH3000 x 1 unit 250T Crawler crane Kobelco x 2 units 100T & 150T crawler crane x 1 unit 70T mobile crane...
Location: Long An international port, Long An Province Clients: Vietranstimex Logistic Wind turbine OEM: Goldwind 4.5Mw Number of WTG: 07 Scope of supply: Unloading, loading to barges transport. Main equipments: 500T Sumitomo CT10000 x 1 unit 250T crawler crane Kobelco x 2 units 100T & 150T crawler crane x 1 unit
Location: Long An international port, Long An Province Clients: Tagi Logistic Wind turbine OEM: Goldwind 3.3Mw Number of WTG: 09 Scope of supply: Unloading, loading to barges transport. Main equipment: 500T Sumitomo CT10000 x 1 unit 250T crawler crane Kobelco x 2 units 100T & 150T crawler crane x 1 unit
Hoa Phat Dung Quat Steel Joint Stock Company was established in February 2017, with a charter capital of VND 10,000 billion and is the investor in the construction and operation of Hoa Phat Iron and Steel Production Complex in Dung Quat Economic Zone, Quang Ninh province. Ngai. This is an important strategic project that, upon completion, will ensure the position of the leading steel producer in...
Nghi Son 2 thermal power plant is a 1,330MW coal-fired power plant planned to be built next to the existing 600MW Nghi Son 1 power plant located in the Thanh Hoa province of Northern Vietnam. The new power plant will be built, owned and operated by the special purpose company, Nghi Son 2 Power Limited Liability Company (NS2PC), which is a 50:50 joint venture between...
Duyen Hai 2 thermal power plant began in Dan Thanh commune, Duyen Hai town, the Mekong Delta province of Tra Vinh on August 3. Covering an area of 60 hectares, the 2.2 billion USD plant has two turbines with a total capacity of 1,200 megawatts. The coal-fuelled plant, invested by Malaysian Teknik Janakuasa Group under a build-operate-transfer (BOT) contract, is expected to become operation in...
The Long Son Petrochemical Complex Project is invested by SCG Group (Thailand), with a total registered capital of about US $ 5.4 billion, scale of nearly 400 hectares of land, nearly 70 hectares of land with water surface and about 194 ha of water surface for port construction. The construction items will commence in November 2019 and synchronously in early 2021. Long Son petrochemical complex is expected to...
Vinh Tan 2 Thermal Power Plant is an urgent project, included in the National Electricity Development Plan for the period 2011-2020 with a vision to 2030 (Power Plan 7) of the Government, built at the Electricity Center of Vietnam. Vinh Tan force, Vinh Tan commune, Tuy Phong district, Binh Thuan province. With a total project investment of about VND 23,477 billion, the plant has a...
Location: Thanh Liem, Ha Nam Province, Viet Nam Scope of work: Crane rental & Services Used the equipments: Crawler crane:600 ton CC2800 with superlift 300 ton, 02 units x 250 ton 7250-2F Mobile crane: Sumitomo SA1100, 500 ton LTM1500 Boom truck crane 15 ton Lifting gear: wire rope, Shackles 25 ton, 35 ton, 55 ton, 4 x 120 ton… Duration: April 2017 to December 2018
Investment project to build Thai Binh 2 Thermal Power Plant (Thai Binh 2 Thermal Power Plant) with a designed capacity of 1,200MW with a total investment of more than 34,295 billion (equivalent to 1.7 billion USD), producing 6,739 per year. billion kWh of commercial electricity. The Government has entrusted the Vietnam Oil and Gas Group as the investor, operator and project manager; coordinate with the...