Projects

Projects

With many years of experience in the field of Heavy Lifting & Services, PLC always strives to become a supplier of top quality in Vietnam and in the region. In order for our customers to rest assured to cooperate, we are constantly improving and developing more every day.

Huong Linh 7 and Gelex 1,2,3 Wind Power Project

Location: Huong Phung commune, Huong Hoa district, Quang Tri Province. Clients: ENERCON Vietnam Company Limited Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Disassemble and Installation. Main equipment: Crawler crane 800T  Zoomlion ZCC9800W, Crawler crane 80 ton Mobile crane 70 ton Duration: Feb-2024 to Mar-2024

7A Ha Do Wind Farm

Location: Phuoc Minh commune, Thuan Nam district, Ninh Thuan Province. Clients: ENERCON Vietnam Company Limited Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Disassemble and Installation. Main equipment: Crawler crane Sany SCC8000A – 800 tons Crawler crane 100 ton Mobile crane 80 ton Duration: 15th Dec 2023 to 15th Jan 2024

YEONGYANG Y3 Wind Power Project

Client: ENERCON Location: South Korea Scope: Supervisor for Crane & Dismantle/Installation blades Used Equipment: Mobilecrane 160-1200T o Assistant Equipments

Da Nang international Port – Moving 9 container cranes (RTG crane)

Moving 9 container cranes from vessel to yard (RTG crane). Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Long An International Port. Number of cranes: 9 RTG cranes. Crane type: RTG (Rubber Tired Gantry Crane) used at container yard.   Our Scope:   Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to...

Binh Khanh Bridge Project

End Client: Vietnam Expressway Corporation EPC Contractor: Shimizu – Vinaconex E&C Location: Nha Be, Ho Chi Minh City Scope: Piling Works- Foundation Type: Steel Pipe Pile (SPP) D1200 Used Equipment: – 250T Crane barge with diesel hammers 10 tons o Tugboat 1200Hp

Phuoc An Port – Moving batch 1 – 4 units STS crane

Moving 4 units STS  cranes from vessel to quay. Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Phuoc An International Port. Number of cranes: 4 STS crane Crane type: STS crane.   Our Scope:  Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to the port. Operate the ballast pump and winch to...

Van Don – Hai Phong province Project

End Client: Vietnam Expressway Corporation Location: Van Don, Hai Phong province Scope: Dismantling tower crane broken by storm Used Equipment: – 800T Mobile crane with full configuration luffing boom.

Huong Phung 2,3 Wind Power Project

Location: Huong Phung commune, Huong Hoa district, Quang Tri Province. Clients: ENERCON Vietnam Company Limited Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Disassemble and Installation. Main equipment: Crawler crane 800T  Sany SCC8000A Crawler crane 80 ton Mobile crane 70 ton Duration: Sep-2024 to Oct-2024

Hai Phong Port TIL INTERNATIONAL TERMINAL-Moving batch 1 (8 RTG crane)

Moving 8 RTG crane container cranes from vessel to yard (RTG crane). Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Hai Phong International Port. Number of cranes: 8 RTG cranes. Crane type: RTG (Rubber Tired Gantry Crane) used at container yard.   Our Scope:  Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship...

Hai Phong Port TIL INTERNATIONAL TERMINAL-Moving batch 2(3 STS crane)

Moving 3 units STS crane container cranes from vessel to yard. Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Hai Phong International Port. Number of cranes: 3 STS cranes. Crane type: STS crane container.   Our Scope:  Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to the port. Operate the ballast pump...

Phuoc An Port – Moving batch 2 – 9 units RTG cranes

Moving 9 units RTG cranes from vessel to yard. Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Phuoc An International Port. Number of cranes: 9 RTG cranes Our Scope: Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to the port. Operate the ballast pump and winch to move the cranes from the...

Long An international Port – Moving 24 container cranes (RTG crane)

Moving 24 container cranes from vessel to yard (RTG crane). Crane manufacturer: Mitsui E&S (MES E&S). Customers using cranes: Long An International Port. Number of cranes: 24 RTG cranes. Crane type: RTG (Rubber Tired Gantry Crane) used at container yard.   Our Scope:   Remove the securing bindings of the cranes on the transport vessel. Calculate and install the gangway system from the ship to...

Tan An Wind Power – Ca Mau province

Location: Long An international port, Long An Province Clients: Infinity Logistic Wind turbine OEM: Windey WD4500 4.5Mw Number of WTG: 07 Scope of supply: Unloading, loading in yard port and to barges transport. Main equipment: 500T Crawler crane Sumitomo CT10000 x 1 unit 250T Crawler crane Kobelco x 1 units 100T & 150T crawler crane x 2 unit 70T mobile crane x 2 unit Team...

Gelex 1,2,3 Wind Power Project

Location: Huong Phung commune, Huong Hoa district, Quang Tri Province. Clients: ENERCON Vietnam Company Limited Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Disassemble and Installation. Main equipment: Zoomlion ZCC5800 x 1 unit. Duration: 16 April 2023 to 16th June 2023

Nghi Son Refinery and Petrochemical – first major maintenance (Turnaround)

Scope of work: Crane rental & Services The main equipments: Crawler crane: 800 ton ZCC9800W Mobile crane: from 45 ton to 700 ton Lifting gear: wire rope, Shackles 25 ton, 35 ton, 55 ton… Duration: 25th July 2023 to 25th Sep 2023

Long An International Port-Moving 3 container cranes (STS crane)

Moving 3 container cranes from barge to quay (RTG crane) Crane manufacturer: Mitsui E&S (MES E&S) Customers using cranes: Long An International Port Number of cranes: 03 cranes Crane type: STS use at quay Our Scope: Remove the lashing and reinforcement system of the ship’s crane; Move 03 STS cranes from ship to shore; Connecting, completing and commissioning 03 RTG cranes; Load test and hand...

Huong Linh 4 Wind Power Project

Location: Huong Linh commune, Huong Hoa district, Quang Tri Province. Clients: Huong Linh 4 Wind Power JSC. Wind turbine OEM: Envision EN3.3MW-141. Number of WTG: 10. Scope of supply: Transport, Cranage & Installation. Main equipment: Man tractor head x 2 units. Shangdong adapter x 2 sets. Demag CC2800-1 x 2 units. IHI CCH2000-5 x 1 unit. Watch the video of the operation here!

Phong Nguyen Wind Power Project

Location: Huong Phung commune, Huong Hoa district, Quang Tri Province. Clients: Vestas Wind Systems A/S. Wind turbine OEM: Vestas V150. Scope of supply: Dismantle & Installation. Main equipment: Demag CC2800-1 x 1 unit.

Quang Trach 1 Thermal Power Plant

The Quang Trach 1 is a 1.2GW coal-fired power plant under construction in the Quang Bình province of Vietnam. Vietnam’s state-owned power utility Vietnam Electricity (EVN) is developing the project with an estimated investment of £1.26bn ($1.78bn). PetroVietnam was the previous developer, which broke ground on the project in July 2011 with commissioning scheduled in 2015. The Government of Vietnam, however, assigned the project to...

Dismantle Container Crane in HICT Hai Phong International Port

PLC uses 800T mobile crane and 120T auxiliary crane with a team of engineers and experienced workers to safely dismantle container cranes with a dismantling height over 60m, requiring high safety, along with the manufacturer’s experts from Mitsui E&S. Location: Tan Cang Hai Phong International Container Terminal (TC-HICT). Don Luong Area, Cat Hai Town, Cat Hai District, Hai Phong City, Vietnam​. Scope of work:  Heavy...

Long An International Port-Moving 3 container cranes (STS crane)

Moving 3 container cranes from barge to quay (RTG crane) Crane manufacturer: Mitsui E&S (MES E&S) Customers using cranes: Long An International Port Number of cranes: 03 cranes Crane type: STS use at quay Our Scope: Remove the lashing and reinforcement system of the ship’s crane; Move 03 STS cranes from ship to shore; Connecting, completing and commissioning 03 RTG cranes; Load test and hand...

Huong Linh 7,8 Wind Power Project

Location: Huong Linh commune, Huong Hoa district, Quang Tri Province Clients: SCI Group Wind turbine OEM: Enercon E138 EP3 E3 Scope of supply: Transport & Installation Main equipment: Man tractor head x 1 unit Shangdong adapter x 1 set Zoomlion ZCC5800 x 1 unit  

Gelex 1,2,3 Wind Power Project

Location: Huong Linh commune, Huong Hoa district, Quang Tri Province Clients: SCI Group Wind turbine OEM: Enercon E138 EP3 E3 Scope of supply: Transport & Installation Main equipment: Man tractor head x 1 unit Shangdong adapter x 1 set Demag CC2800-1 x 1 unit

Huong Linh 3 Wind Power Project

Location: Huong Linh commune, Huong Hoa district, Quang Tri Province. Clients: Power China. Wind turbine OEM: Envision EN3.3MW-141. Number of WTG: 9. Scope of supply: WTGs Transportation. Main equipment: Man tractor head x 2 units. Shangdong adapter x 2 sets.  

Huong Phung 2,3 Wind Power Project

Location: Huong Phung commune, Huong Hoa district, Quang Tri Province. Clients: SCI Group. Wind turbine OEM: Enercon E138 EP3 E3. Scope of supply: Transport & Installation. Main equipment: Man tractor head x 1 unit. Shangdong adapter x 1 set. Demag CC2800-1 x 1 unit.

Nam Dinh Vu Port – Moving 9 container cranes (RTG crane)

Moving 9 container cranes from vessel to yard (RTG crane) Crane manufacturer: Mitsui E&S (MES E&S) Customers using cranes: Nam Dinh Vu Port Number of cranes: 9 cranes Crane type: RTG (Rubber Tired Gantry Crane) used at container yard Our Scope: Remove the lashing and reinforcement system of the ship’s crane; Move 9 RTG cranes from ship to shore; Connecting, completing and commissioning 9 RTG...

Tai Tam Wind Power Project

Location: Huc commune, Huong Hoa district, Quang Tri Province Clients: Tai Tam Group Wind turbine OEM: Envision EN3.3MW-141 Number of WTG: 16 Scope of supply: Cranage and Installation Main equipment: Zoomlion ZCC5800 x 1 unit Demag CC2800-1 x 1 unit Sany SCC8000A x 1 unit

Hoang Hai Wind Power Project

Location: Huc commune, Huong Hoa district, Quang Tri Province Clients: Tai Tam Group Wind turbine OEM: Envision EN3.3MW-141 Number of WTG: 15 Scope of supply: Cranage and Installation Main equipment: Zoomlion ZCC5800 x 1 unit Demag CC2800-1 x 1 unit Sany SCC8000A x 1 unit

Vien An Wind Power Project

The Vien An wind power plant will have a capacity of 50 MW, which is an investment project of the Vien An Energy One Member Limited Liability Company, with capital of around VND 2,411 bn, to be built in the Ngoc Hien District of Ca Mau Region with 16 WTG x MySE3.2-156. The project information is as follows: Investor: Vien An Energy Company Limited Turbine OEM:...

Lotte Mall Ha Noi Project

Located in Tay Ho district, Ha Noi City Scope of work:  Heavy lifting contract From April 2021 to May 2021 Used the equipments: Main crawler crane: 750 ton Liebherr LR1750 Mobile crane: 120 ton Mobile crane Lifting gear: wire rope, Shackles 25 ton, 35 ton, 55 ton, 4 x 120 ton…

VPL Ben Tre Wind Power Project

Location: Thoi Thuan, Binh Dai dist, Ben Tre Province, Viet Nam Scope of work:  Piling works PHC D800/60-70m (from March/2021 to May/2021) total: 15,000md Used the equipments: 1. Barge/crane: 3600 tons (71×18.5m)/200 ton, diesel hammer 10 ton… 2. Barge/crane: 9000 tons(100×27.5m)/250 ton, diesel hammer 10 ton… 3. Barge/crane: 1800 tons(52x16m)/150 ton, diesel hammer 10 ton… 4. Barge/crane: 3500 tons(63x20m)/250 ton, diesel hammer 10 ton… 5. Barge/crane:...

Hoa Dong 2 Wind Power – Soc Trang province

Location: Long An international port, Long An Province Clients: Infinity Logistic Wind turbine OEM: Envision 3.3MW-141 Number of WTG: 22 Scope of supply: Unloading, transport, loading to barges transport. Main equipment: 500T Crawler crane Sumitomo CT10000 x 1 unit 300T Crawler crane IHI DCH3000 x 1 unit 250T Crawler crane Kobelco x 2 units 100T & 150T crawler crane x 1 unit 70T mobile crane...

Sunpro Ben Tre Wind Power Project

Location: Long An international port, Long An Province Clients: Vietranstimex Logistic Wind turbine OEM: Goldwind 4.5Mw Number of WTG: 07 Scope of supply: Unloading, loading to barges transport. Main equipments: 500T Sumitomo  CT10000 x 1 unit 250T crawler crane Kobelco x 2 units 100T & 150T crawler crane x 1 unit    

Thanh Phong – Ben Tre Wind Power Project

Location: Long An international port, Long An Province Clients: Tagi Logistic Wind turbine OEM: Goldwind 3.3Mw Number of WTG: 09 Scope of supply: Unloading, loading to barges transport. Main equipment: 500T Sumitomo  CT10000 x 1 unit 250T crawler crane Kobelco x 2 units 100T & 150T crawler crane x 1 unit    

Cau Dat Wind Power Project – Lam Dong province

Location: Cam Ranh international port, Khanh Hoa Province Clients: Cam Ranh Port Wind turbine OEM: GE 4.0Mw Number of WTG: 15 Scope of supply: Unloading, loading to truck transport. Main equipment: 110T Sumitomo  x 1 unit 200T crawler crane x 1 unit 450T mobile crane x 1 unit    

Phuong Mai 1 Wind Power Project

Location: Phuong Mai district, Binh Dinh Province Clients: Dong Do Group Wind turbine OEM: GE 2.4MW Number of WTG: 12 Scope of supply: Cranage (From December 2020 to March 2021) Main equipment: Demag CC2800-1 x 1 unit

Hoa Phat Iron and Steel Production Complex

Hoa Phat Dung Quat Steel Joint Stock Company was established in February 2017, with a charter capital of VND 10,000 billion and is the investor in the construction and operation of Hoa Phat Iron and Steel Production Complex in Dung Quat Economic Zone, Quang Ninh province. Ngai. This is an important strategic project that, upon completion, will ensure the position of the leading steel producer in...

Bach Dang Bridge project

Address: Hai Phong – Ha Long Size: Main bridge 3,054km long, 25m wide, designed with 4 lanes, maximum speed 100km / h, clearance for boat 250m wide, 48.4m high to withstand earthquakes Commencement date: January 25, 2018 Total investment: 7600 billion

Hoa Binh 1, 2 Wind Power – Bac Lieu province

Location: Hoa Binh, Bac Lieu Province, Viet Nam Scope of work:  Mass piling construction of prestressed centrifugal concrete piles PHC D800C for wind turbine foundations. total: 30,000md Used the equipments: Barge/crane: 1800 tons/150 ton, diesel hammer 10 ton…  

Chinh Thang Wind Power Project – Ninh Thuan Province

Location: Cam Ranh port, Khanh Hoa province Clients: Cam Ranh Port Wind turbine OEM: Windey 3.5Mw Number of WTG: 16 Scope of supply: Unloading, loading to truck transport Used the equipments: 110T Sumitomo  x 1 unit 200T crawler crane x 1 unit 450T mobile crane x 1 unit    

Vinh Dam port – Phu Quoc island

Location: An Thoi district, Phu Quoc island Kien Giang Province, Viet Nam Scope of work: Crane Barge rental & Services Used the equipments: Crane Barge 150T, (150T crawler crane with Barge 1800T). Lifting gear: wire rope, Shackles 25 ton, 35 ton, 55 ton, 4 x 120 ton… Duration: April 2020

Nghi Son 2 Thermal Power Plant

Nghi Son 2 thermal power plant is a 1,330MW coal-fired power plant planned to be built next to the existing 600MW Nghi Son 1 power plant located in the Thanh Hoa province of Northern Vietnam. The new power plant will be built, owned and operated by the special purpose company, Nghi Son 2 Power Limited Liability Company (NS2PC), which is a 50:50 joint venture between...

Duyen Hai 2 Thermal Power Plant

Duyen Hai 2 thermal power plant began in Dan Thanh commune, Duyen Hai town, the Mekong Delta province of Tra Vinh on August 3. Covering an area of 60 hectares, the 2.2 billion USD plant has two turbines with a total capacity of 1,200 megawatts. The coal-fuelled plant, invested by Malaysian Teknik Janakuasa Group under a build-operate-transfer (BOT) contract, is expected to become operation in...

Long Son Refinery and Petrochemical

The Long Son Petrochemical Complex Project is invested by SCG Group (Thailand), with a total registered capital of about US $ 5.4 billion, scale of nearly 400 hectares of land, nearly 70 hectares of land with water surface and about 194 ha of water surface for port construction. The construction items will commence in November 2019 and synchronously in early 2021. Long Son petrochemical complex is expected to...

220kV Kien Binh – Phu Quoc transmission line

Location: Kien Giang offshore, Kien Giang Province, Viet Nam Scope of work: Piling works PHC D700 & D800 Quantity: 33,000 md Used the Equipments : Barge 1800 tons & 1000 tons, crawler crane 150 tons – IHI CCH1500E, diesel hammer 8 ton…  

Vinh Tan 2 Thermal Power Plant

Vinh Tan 2 Thermal Power Plant is an urgent project, included in the National Electricity Development Plan for the period 2011-2020 with a vision to 2030 (Power Plan 7) of the Government, built at the Electricity Center of Vietnam. Vinh Tan force, Vinh Tan commune, Tuy Phong district, Binh Thuan province. With a total project investment of about VND 23,477 billion, the plant has a...

Heneken Cambodia Brewery project

Location: Phoum Robos Angkagne, Sangkat Prek Eng, Khan Chbar Ampov, Phnom Penh, Cambodia. Scope of work: Crane rental & Services Used the equipments: Crawler crane:120T IHI CCH1200 Lifting gear: wire rope, Shackles 25 ton, 35 ton, 55 ton… Duration: April 2017 to July 2017

Xuan Thanh Cement Factory

Location: Thanh Liem, Ha Nam Province, Viet Nam Scope of work: Crane rental & Services Used the equipments: Crawler crane:600 ton CC2800 with superlift 300 ton, 02 units x 250 ton 7250-2F Mobile crane: Sumitomo SA1100, 500 ton LTM1500 Boom truck crane 15 ton Lifting gear: wire rope, Shackles 25 ton, 35 ton, 55 ton, 4 x 120 ton… Duration: April 2017 to December 2018

Nghi Son Cement Factory

Location: Nghi Son district, Thanh Hoa Province, Viet Nam Scope of work: Crane Barge rental & Services Used the equipments: Crane Barge 150T, (150T crawler crane with Barge 1800T). Lifting gear: wire rope, Shackles 25 ton, 35 ton, 55 ton, 4 x 120 ton… Duration: Sep 2018

Thai Binh 2 Thermal Power Plant

Investment project to build Thai Binh 2 Thermal Power Plant (Thai Binh 2 Thermal Power Plant) with a designed capacity of 1,200MW with a total investment of more than 34,295 billion (equivalent to 1.7 billion USD), producing 6,739 per year. billion kWh of commercial electricity. The Government has entrusted the Vietnam Oil and Gas Group as the investor, operator and project manager; coordinate with the...